1 / 2
Sloped Top Removable Steel Bollard with Lock – 114mm Diameter, 895mm Above Ground, Silver
£393.60
incl. VAT
Not sure it's the right one?
Tell us where and how it will be used — we'll confirm the right product before you order.
Overview
Control vehicle access while still letting authorised vehicles through when needed. The robust steel post locks into a base set beneath the ground to stop unauthorised access, and the built-in lock and lift-out design let you remove it quickly. Ideal for business parks, forecourts, car parks, private access roads, driveways, pedestrianised streets and outdoor shopping centres, where occasional access may be needed for emergencies, maintenance, utility works, waste collection or street cleaning.
Specifications
| Size | 114mm Diameter – 895mm H Above Ground, 205mm Below Ground |
|---|---|
| Height Above Ground (mm) | 895 |
| Height Below Ground (mm) | 205 |
| Base Plate Width (mm) | 290 |
| Base Depth (mm) | 210 |
| Base Width (mm) | 155 |
| Central Pole Diameter (mm) | 114 |
| Colour | Silver |
| Weight (kg) | 8.3 (bollard), 8.5 (base) |
| One Year Warranty | Yes |
| Leave Outside | Yes |
| Colour Options | Grey |
Features
- Sloped top lets rainwater run straight off the post.
- Built-in lock with two keys, so only key holders can remove the bollard.
- Reflective strip makes the post visible to drivers.
- Flush when removed: the below-ground base leaves the surface clear, so pedestrians and vehicles, including low-clearance vehicles, can pass over.
- The underground base adds stability and strength, making the post harder to remove by force.
- Polished silver steel post with a galvanised, powder-coated underground base for protection against corrosion.
- Durable, low-maintenance and weather-resistant, for domestic and commercial areas.
- At under 10kg, one person can lift and move the post.
- One-year warranty.
Using the Bollard
- To lock: insert the key, push it down and turn it to move the locking pin into the bollard.
- To open access: unlock and lift the bollard out.
- Useful where access changes during the day or week, for example closing a business car park overnight or pedestrianising a street for a weekly market.
Installation
Excavation is needed, so installation by a confident builder is recommended. It usually takes 1–2 hours.
Compare other options
All bollards & barriers →
Added to your basket
View basket